Sentrix Digital South Africa · Products

Live · riskatlas.co.za

South Africa

We serve South Africa too. Group income protection, a Date of Absence, an employer who holds the records, and a medical scheme that runs beside the policy — not instead of it.

Why this market

South African income-protection claims fail on paper more often than on medicine. Dates do not line up. ‘Illness’ is written as if it were incapacity. The scheme file and the insurer file are treated as one thing. The National Financial Ombud is the complaint path after internal review — but only if the file can be argued from.

Context

Group cover sits with the employer

Absence registers, payslips, the job specification, and the employer statement are often decisive. The claimant does not hold them. The compiler names who does.

Context

Scheme ≠ policy

CMS medical schemes, PMB, CDL, and DTP are a parallel system. They do not decide disability. Mixing the two languages is a common way a valid claim is refused.

Context

Date of Absence is a legal fact

It is not averaged with the first sick note or the insurer’s own calculation. Conflicts stay visible. That is what the waiting period and the NFO clock run from.

Local system context

Cover

Group and individual income protection; disability / lump-sum

Disablement date

Date of Absence (DOA)

Privacy / access

POPIA and, where it applies, PAIA

Internal challenge

Internal review

External complaint

National Financial Ombud (NFO)

Clinicians

HPCSA

Financial conduct

FSCA

Health overlay

Medical schemes — CMS, PMB, CDL, DTP

Currency

ZAR

Offsets

UIF, sick pay, other IP

Sentrix Digital products in South Africa